Abbot Point - Outloading String OL1 Upgrade

Our scope of work covered the supply and installation of concrete, structural steelwork, mechanical equipment and electrical works associated with the upgrade of the existing Outloading String 1 of seven (7) conveyors (OL1).

Conveyor Transition Chute - Abbot Point
Conveyor Transition Chute - Abbot Point 2

© 2016 by TEAM Group (Aust)

Created by CynFX Digital

Call us on 07 4968 2000 or email sales@teameng.com.au

0
  • Facebook - Grey Circle
  • LinkedIn - Grey Circle