top of page
Abbot Point - Outloading String OL1 Upgrade
Our scope of work covered the supply and installation of concrete, structural steelwork, mechanical equipment and electrical works associated with the upgrade of the existing Outloading String 1 of seven (7) conveyors (OL1).
![]() | ![]() |
---|
bottom of page