© 2016 by TEAM Group (Aust)

Created by CynFX Digital

Call us on 07 4968 2000 or email sales@teameng.com.au

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle
0

OUR PROJECTS

 

We have a reputation for delivering the technically complex and challenging projects with skill and innovation. Every day, our people are working to deliver projects for our clients.

We have a solid history in delivering projects with over 2000 successful projects delivered, ranging from 1hr workshop fabrication projects to 350,000 hrs site construction projects.

Below is a snap shot of some of our projects. 

Installation of yard machines
Anglo American - Grosvenor mine
Installation of stackers & reclaimer
Breaker Barrels
BMA Goonyella Riverside
Drafting, RPEQ Engineering and Fabrication of Rotary Breaker Barrels
Super combi overhaul
BMA Broadmeadow
Stacker Reclaimer Recovery
Paiton - Surabaya Indonesia
Stacker Reclaimer 1 Machine Recovery and Return to Operation
Mechanical Installation of Vent Fans
Grosvenor Mine - Howdens
Supply of labour for the mechanical installation of vent fans
SR1 - Removal
DBCT
SR 1 - Deconstruction
MSR Recovery
Rio Tinto - Clermont Mine
Blackwater Mine HVW Lube Facility
Installation of 9 above-ground storage tanks (AST) and associated civils, pipework and bunding.
Decommissioning and rehabilitation
Rio Tinto - Kestrel Mine
Cable Arch
Towable cable arch
SL1 Repairs
BMA Hay Point
Slew Bearing Replacement
Rio Tinto - Clermont Mine
Abbot Point - Bund Rail
Abbot Point - Bund 1 2km Stacker Reclaimer
Rail Replacement, thermit welding, alignment and levelling of rail mounts
Truck Dump Hopper
Rio Tinto - Clermont Mine
Truck Dump Hopper
Design & Fabrication - Cable Reeler
BMC - South Walker Creek
Design and fabrication of a Truck Mounted Cable Reeler
Forgan Bridge Support Steel
Supply, draft, fabrication, surface treat and delivery of more than 700T of temporary support steel work for the Forgan Bridge Project
Abbot Point - Outloading Upgrade
Outloading String OL1 Upgrade - supply and installation of concrete, structural steelwork, mechanical equipment and electrical works
Duratray - CAT 789
Duratray - CAT 789 Assembly and fabrication
Duratray - CAT777
Duratray - CAT777 Assembly and fabrication
Bucketwheel & booms
Rio Tinto - Blair Athol Coal
Bucketwheel and booms design and manufacture for SR1 and SR2
Oaky Creek Conveyor Truss
Port Waratah RE1
Complete structural overhaul including new slew bearing, swing rack, bucket wheel, boom pivot trunnion supports, pins and bearings.
Disassembly & Removal of SR1
Dalrymple Bay Coal Terminal
Disassembly and Removal of Stacker Reclaimer 1
Breaker Barrel
Rio Tinto - Blair Athol Coal
Rotary Breaker Changeout and apron feeder major overhaul
Erection - surface coal facility
BMA Crinum Mine
Erection of all surface coal handling facilities
Temco Bell Bay
Slew Bearing
Show More